+41 52 368 60 60 or

Relocation of a heavy-weight

A single company did it all: unloaded the 95 ton press with four hydraulic lifting columns (360t, lifting height of 3,050-8,380mm) and relocated it in horizontal position with a system of transport dollies, put the press upright hydraulically, moved it to the pit, and leveled it by hand.

 

Photos: Bauberger AG



Go back