So erreichen Sie uns: +41 (0)52/368 60 60
oder

By Night ...

Bauberger AG not only works at every location and under any circumstances but also at any time, including nighttime.

After being dismantled, the 80-ton Dieffenbacher hydraulic press was transported to its new site. The road had to be closed, so the work was carried out at night.

Two vehicle-mounted cranes with lifting capacities of 180 t and 500 t moved the tonnage through an opening in the roof and placed it upright on the already prepared equipment plinth. Then, the mechanics from Bauberger re-attached the accessory parts and conducted a trial run to put the machinery back into operation.

 

Team: Christian Schumacher,
Gregor Schädler,
André Meier,
Willy Büsser, and
Roland Kundert
Object: Dieffenbacher hydraulic press
Size: 7.5 x 3.3 x 2.2 m
Weight of press body: 80 tons
Total weight of press: 87 tons
Material weight: total of 79 tons

Lifting and moving equipment:

  • Two 90 t column lifts
  • Two 32 t column lifts
  • Fork lift truck, 7 t, with boom
  • Work platform, 7 meters
  • Knuckle boom crane, 100 metric tons
  • Installation dollies
  • Steel cross bars, travel rails, lifting lug, modular wood pieces, 120 t transport dollies, machine lifter, etc.

Photos: Bauberger AG 

 

Go back