Introduction  

«There is a lot of optimism around - and we are getting down to business as usual!» 



Even if not everything is back to normal (yet), we are gradually approaching a new normality. But as usual, we are happy to report about interesting projects from the past months. And some things did not change: We were again moving a lot.
 
One of our assignments took place at Bruker Switzerland AG in Fällanden to move 24 large machines from the basement to the 3rd floor.
 
Another "research assignment" took us to Davos to the SLF. Without any danger of potential avalanches, we moved various machines and equipment to a temporary facility and to the Flüela valley. 
 
Far away from the mountains, at Lindt & Sprüngli on the shore of lake Zurich, we brought more than 20 trucks full of material for a new production plant from our heavy goods warehouse directly into the production halls and even assisted with the assembly – For more details see "the chocolate job".
Sincerely,
Marcel Bach & Team
On the road  

Big machines travel for small molecules


24 heavy machines travel to the third floor of a new building at Bruker Switzerland AG.
 
About molecules

Avalanche danger – On a research mission in Davos

Move of machinery and equipment into a provisional at WSL institute SLF.

About avalanches

A job sweet as chocolate

More than 20 trucks full of material for a new production plant at Lindt & Sprüngli.

About chocolate
By the way  
GIRNetwork
We are proud to be the first Swiss company to be accepted as a member of the GIRNetwork. We are convinced that thanks to this global network of qualified companies in the field of industrial removals and relocations, we can support our customers even better in international relocations - don’t hesitate to test us!



Editor/Publisher: BAUBERGER AG, CH-8353 Elgg
Four issues a year, ©2021 BAUBERGER AG
</center>